Four ways to condition a system

Portable for the rounds you make every week, off-line for the systems that can't come down, vacuum when water is the problem — or purpose-built when none of the above fits.

01

Filter carts

Portable transfer and polishing carts for filling reservoirs, drum transfer and scheduled cleanup rounds. Dual-stage on the 30 GPM and up.

  • 2–20 GPM
  • Dual stage
  • β 2000 media
  • In series or parallel flow
  • Cart-mounted
DFP portable filter cart for hydraulic and lubrication oil, with dual-stage filtration, gauges and a motor-driven pump

Build time

4–6 weeks

02

Vacuum dehydrators

When water is the failure mode. Removes free, emulsified and dissolved water plus entrained gas, down to the ppm range.

  • 3–100 GPM
  • Water + gas removal
  • PLC control
DFP vacuum dehydrator skid

Build time

Per application

03

Kidney loop skids

Off-line polishing that runs continuously alongside the system — cleanliness improves without ever shutting the machine down.

  • Continuous duty
  • Off-line loop
  • Duplex option
  • Skid-mounted
Three DFP kidney-loop filtration skids with stainless housings, gauges and pumps

Build time

4–8 weeks

04

Custom systems

Test stands, hydraulic power units, liquid containment and one-off conditioning packages built to your print or ours.

  • Test stands
  • HPUs
  • Liquid containment
  • Built to print
DFP custom hydraulic test bench with touchscreen controls

Quoted

Per application

How we size it

Tell us about your system application and specs.

Elements, housings, equipment and the team that specs them — sourced from one supplier, quoted on one PO.

Step 1

Send us the conditions

Fluid, viscosity, reservoir volume, flow, and the ISO 4406 code you need to hold.

Step 2

We size and quote

Media, stages, pump and controls specified around the duty — then priced for your configuration.

Step 3

We commission it

Our technicians start it up on site, verify cleanliness, and train the crew running it.

Field service & consulting

The equipment is half of it

Technicians who know the hardware and audit the system it sits in — so the cleanliness target holds after we leave.

01

On-site service

Commissioning, startup, repair and preventive maintenance on DFP equipment and the systems around it — dispatched to your plant.

  • Commissioning
  • Repair
  • Preventive maintenance
  • Startup training

Coverage

On-site · US

02

System audits

We measure what the system is actually running at, then set a defensible ISO 4406 target and the filtration needed to hold it.

  • ISO 4406 targets
  • Particle counts
  • Filtration survey
  • Written report

Turnaround

Report in 1 week

03

Condition monitoring

Scheduled oil sampling with trend reporting, so element changes and water ingress get caught before a failure does.

  • Oil sampling
  • Lab analysis
  • Trend reporting
  • Change intervals

Cadence

Monthly · quarterly

Contact us

Send us the conditions and we'll size the system.

Fluid, flow and target cleanliness is enough to start. We'll get pricing for your configuration back to you quickly.

Contact us